Featured News
News
Featured News
Aether DBS has earned position 2364 on the Inc. 5000 list, making the list for a second time in five years!
Every year, ZweigWhite recognizes the fastest-growing architecture, engineering, planning, and environmental consulting firms in the country with The Zweig Letter Hot Firm List.
In response to the December 2008 TVA Kingston, TN ash release, the EPA has been taking steps to assess economizer ash facilities around the country. In March 2009, the EPA began investigating facilities that store coal combustion residuals (CCR) onsite to evaluate which sites may pose a risk to the environment. As a proactive measure, Alliant Energy initiated a preliminary study for their Burlington, Iowa generating station, contacting Aether DBS based on our expertise and previous work on the TVA project.
Although our AFC™ blender is typically known for it’s application to synthetic natural gas (SNG) projects, the mixing technology is beneficial to many industries. The AFC™ blender can be used with a source of biogas or with by-product gas from processes, even if flow or quality are inconsistent. Stop flaring unused gas!
Aether DBS announces the immediate availability of its WB series of Natural Gas line heaters. The natural gas line heaters (also referred to as Glycol Heaters or Pipeline heaters) are used in the natural gas industry at Tap or Gate Stations. These heaters help to prevent the formation of ice crystals with dramatic pressure drops.
Aether’s WB series natural gas line heaters are available with standard heating capacity of 500 to 18,000 SCFM. In the vertical configuration, the WB series takes up as little as 4.5’ by 3.5’. To simply the installation process, all of Aether’s line heaters are skid mounted with flange-in and flange-out connections. Common options include containment system with float alarms, Maintenance Housing to enclose the control system as well as provide protection against the environment, and force draft burners to increase efficiency.
In addition to the standard designs, Aether’s team of design and applications engineer can configure the products to meet the application requirements. Please contact us today to discuss how we can meet your requirements.
July 22, 2010
HHS was very proud last month to announce the acquisition of Ely Energy in Tulsa, Oklahoma. Together as one new company,aether dbs, we offer clients full service design/build solutions and engineered modular systems for air, water, energy, infrastructure, and environmental projects. Please check back with us here or visit www.elyenergy.com in the interim as we develop our new website, www.aetherdbs.com.
August 16, 2010
By: John Myers, Duluth News Tribune
Mud poured down West Duluth’s hillside 40 years ago, loosed from the grip of tree roots excised for Spirit Mountain ski runs and Interstate 35.